Weighbridge Installation in Gujarat: Site Preparation, Civil Work & Checklist
Step-by-step breakdown of the installation process for a weighbridge—covering location selection, civil work, electrical setup, and common pitfalls to avoid.
6/17/20251 min read


Installing a weighbridge isn’t just about placing a platform—it’s an infrastructure project. From choosing the right location to final calibration and government stamping, there’s a method to the process. Here's a simplified installation guide curated by Shree Shree Weighing Solutions, with over 15 years of hands-on experience across Gujarat.
📍 Step 1: Location Selection
Choose a flat, well-drained surface.
Ensure access for heavy trucks and minimum 6m of approach road.
Avoid areas with high groundwater or flooding.
🧱 Step 2: Civil Foundation
Pit-type: Requires deep RCC foundation.
Pitless: Needs concrete ramps on both ends.
Allow 15–20 days for drying and setting before equipment mounting.
⚡ Step 3: Electrical & Digital Setup
Load cell wiring
Printer & display integration
Connection to ERP or billing systems (POS ready if required)
✅ Step 4: Government Stamping & Certification
Arrange for initial stamping from the Weights & Measures Department
We coordinate this for you and provide pan-India stamping service
📌 Pro Tip:
Always plan drainage and pest control systems in advance for long-term maintenance savings.
At Shree Shree Weighing Solutions, we manage end-to-end installation including load cell fitting, calibration, stamping, and software integration.